Main /
SpaceclassNotesDiscussion notes: 2nov2012: dave3/bob progress; plans for winter term 26oct2012: more dave3 range issues, bob batteries 19oct2012: range checks prep 12oct2012: Dave's SmallSat conf presentation here 28sept2012: dave2 and bo 21sept2012: dave2 and bob 18sept2012: dave2 flight notes 14sept2012: dave2 prep; drop test prep 17aug2012: dave2 MRR; drop test prep 9aug2012: dave2 prep schedule 6aug2012 : new GPS; Dave2 prep and to-do list 3aug2012 : DNT tutorial 20july2012 : debrief and lessons learned and tasks 16july2012 : debrief and lessons learned and tasks 13july2012 : MRR notes for dave flight 10may2012 includes duck float logistics and personnel 1may2012 includes schedule for ducks!!! 3apr2012 MRR meeting. This is a list of things to fix/change/update in the MRR document. MRR document when complete should also be uploaded. REVISED 4 apr with notes. REVISED AGAIN 5 apr with open items starred. |