Discussion notes:
2nov2012: dave3/bob progress; plans for winter term
26oct2012: more dave3 range issues, bob batteries
19oct2012: range checks prep
12oct2012: Dave's SmallSat conf presentation here
28sept2012: dave2 and bo
21sept2012: dave2 and bob
18sept2012: dave2 flight notes
14sept2012: dave2 prep; drop test prep
17aug2012: dave2 MRR; drop test prep
9aug2012: dave2 prep schedule
6aug2012 : new GPS; Dave2 prep and to-do list
3aug2012 : DNT tutorial
20july2012 : debrief and lessons learned and tasks
16july2012 : debrief and lessons learned and tasks
13july2012 : MRR notes for dave flight
10may2012 includes duck float logistics and personnel
1may2012 includes schedule for ducks!!!
3apr2012 MRR meeting. This is a list of things to fix/change/update in the MRR document. MRR document when complete should also be uploaded. REVISED 4 apr with notes. REVISED AGAIN 5 apr with open items starred.