Recent Changes - Search:

PmWiki

pmwiki.org

edit SideBar

10may2012

saturday

prenoon: batteries, packing, turnons

--patrick/amanda 10am

noon wilder

--patrick

  amanda
  peter y 1  canoe

  steph n
  ralph y 2  canoe

  jon y 3 k
  todd y 4 k  downstream

  tom y 5  fleet  either, canoe
  max y 6 k fleet  pictures

  k n , tim y (unti 2:30,3)

ellen sunday not sat, y nina sunday, maybe sat, n ha sat or sunday, y

megaphone***k

instructions: stuck duck: return to center of river as reasonable

startup:

poohsticks

after all turnons good other boats downstream one conoe, 10 ducks, row across 0.1x width second canoe, 10 ducks,

one big canoe (p, am, computers, paddler) 2 more canoes 2 kayaks out front, one more for max tim/k purple canoe

need:

3 can, 3 kay, noon sat......

foam: cutter now working. then stopped. 9 copies+1. other 10 blocks.

fins/etc: machining done. assembly by fri aft, see

electronics all turned on. ricky mag not working. not all gps acquired yet. half. hopefully today. no extras except 21st duck...

jon: curl and divergence --payloads should travel in a sine curve

reatime: patrick (makes kml files) files: tom, jon tom upright, spinny kml: sinusoidal streamlines tom/jon: pos/time >> vel, posn, time jon: interpolated flow field from meas lines

      --vector opersation on it
      --expectatin for velocity vs depth
  • magiliiagn

gc6 (5) chipsat idea

solar panels: --develop new board copy --later may: pscpice

patrick--realtime,amanda--new data --??how is data packettized and buffered clarified baud rates. radios always at 250K. control only how radio talks to ard or computer. xbee: if losing packets to full buffer, rates incompatible. still should be emptying fastre than filling up. workable wtih 2 groundstations. cmp is at 115K

--at what point do they trip over each other (10-20)

dave: on hold --logic levels, power spikes; ***order intermediate caps --new board layout for DNT support board, using expressPCB --dave needs further testing but design now ok --summer flight, chipsats, new solar panel

amanda schedule --thesis defense 28 may, 4 wks --fancy launch by 21 may: ompom vs upper white --first full launch 12 may: ledyard to wilder --finish assembly/testing 12-13 --mech ass 7 may wk --mech fab 1 may wk

stk/peter/max

cubesat followups: rome arduino cubesat, smartphone, qb50deployment,af nanosat...patrick, before end of term ***

solar panels: uah charging***p/p/s followup

thomas data sensitivity; mag coils? ***

jon: plots of flow??

ben: drawings

big wheel cart....

Edit - History - Print - Recent Changes - Search
Page last modified on May 10, 2012, at 01:22 PM