15feb2012amanda: fix remaining? everything except new gps is working. some new gps antennas have been ordered. **check with casey. playing with baud rates: new xbees at highest baud rate **tabulate data rates and estimate data choking so we know how many receivers jon: river, sd cards, tm defn --river stuff: working on cost benefit of additional payloads. --number of data points vs error (difference from model) --need to convert on real life coordinates --time dependence? --river problem: gps position tells you the velocity. --switch to real units thomas: data files/matlab parsing data from files data from two payloads is in two different paths??? why? thomas/amanda pursue files patrick: working on realtime???? max: foam/airports/stk? airports: rutland contact addressing safety, wind still bad (down for 18th) stk still waiting. steph/peter: -have a new board design for dave panel with 24 cells instead of 8. 24 arranged 12 groups of (2 in seriers), 12 groups in parllel, fits on a 2U side. -will run by dave. -cc design, iterate with stauth ben: still waiting on drawings, re-request |