17aug2012GC 17 Aug Dave2 MRR Can't launch this weekend. Doing everything D-1 except batteries and car. Add SD card and pointing DNTs to "changes"
add blankets or foam box (Patrick)
Ham radio exams in fall*** Tuesday 28th!!! Dylan? Will? testing report: thursday, tested lump system of all new technology put together: --DNT with new antennas --new DNTs transmit/recieve --SD card (**check this) --new GPS (acquisition less than minute) (only GGA strings now) --new code on Arduino (6 samples per second) --tested new tim code (reception of DNT, setting own position) --didn't turn on ham or ham pointing (**ensure do before flight) --DNT pointing (**practice this) --receiving ham and dnt for recovery on PC with realterm; use mac to do pointing --todd mechanical measurements*** MRR:
--- schedule: batteries and final mechanical wednesdayish final checks (ham, dnt pointing) monday 27th todd: verify faa, car, weather friday 24 drop test status spindle fixed so foam can be cut; need drawings first jake check with me monday*** todd: **ask whitey to put bolt hole pattern in back, work with max and jake to make mass dummy to match the bolt hole pattern. |