Recent Changes - Search:

PmWiki

pmwiki.org

edit SideBar

21june2012

21 June 2012

peter/dylan/rob/max/todd/thomas [patrick]

July: -Dave1

       --solar panels
       --new layout
       --coat subsidiary electronics
       --work with patrick to reassemble dave

       -innards 
       --DNT900 capacitor
       --arduino/solarpanel interface
       --general assembly and test

peter: solar panels (orig dave flight) patrick: innards todd: outers thomas: data

max: winds (train todd as well)

peter/max: recovery

todd/dylan/rob: ham radio license this summer

todd/patrick: software radio

Aug: -dave2

      --charge controller perhaps with arduino
      --arduino fancier stuff:  data buffer
      --accel upgrade?

altair:

--fairchild atrium: drop of parachute deploy --drop test from tethered balloon: parachute didn't deploy, --so payload broke. --rebuilding. --another drop test this weekend.

Edit - History - Print - Recent Changes - Search
Page last modified on June 21, 2012, at 01:53 PM