26oct2012DNT power demo on scope. aim for 3 nov dave3 launch do gile tower check 27 oct --10am wilder lab, peter on roof, jacob/jake/todd on tower --show expected reception...revise checklist --dave3 20 sent/sec; bob 400/sec in dave3 hardware --goal: compromised batt w/o cap has low signal strenght; 9V AA pack w/cap has significantly higher signal str dave3 launch goals: --fly wiht DNT whole flight --no more power cycling --solar panel at max power point --binary data tranmission --push for 3 nov (jake to confirm wed) bob: --uaf 5-9 november --battery configuration??? mechanical single pack, electrically 2 --turn on/off logistics --3 (2) more innards with new battery cavity --spin test ---Ongoing
Bob: mechanical/range//fitcheck/data
Dave3: /range//data/mech/power
logistics: range/flight
rate sensor
Solidworks thermal model
STK
data assimilation
|