Recent Changes - Search:

PmWiki

pmwiki.org

edit SideBar

3july2012

friday 11 haystack

all charges to greencube5; check with k when ordering!!!

  • mon, fri 11

jake, alex

dave flight

rob H: patrick checkout list on cupbard***

drop test --successful --independent altair flight in next 2 weeks --1 mile south of MWRA recovery --pre dawn --apogee about 10K feet --max in charge of logistics and permissions --talk to ed stevens****

small ro --on for fall --dave development --mechanical issues

wii acc --***side by side w/ wii and duck --response to high spin rates? --accuracy of acc data? --calibration??

patrick status --DNT subboard working. --build up a spare*** --gps board: with no alt limit*** --peter/patrick solar panel connection*** --thermistor?? --new battery packs needed (dated/labelled)*** (update gdocs) --ham radio thermistor?? --thermistor for solar panel surface --data output: 1. solar panel voltage 2. solar panel temp 3. 4. mag/acc 5. 6. 2 photomoeters

require ham radio therm for box temp***

current draw comparison????***

peter:: check with robyn re maximum temp***

testing plan***

peter another board --charge controller ongoing

todd logistics --ralph available --overlap of launch procedures? --split mrr*** --recovery team procedures --earliest next weekend

tom ongiong --next week

cedar --hien vo --aug 15 --patrick FWS/peter WS/toddFW/tomFS/dylan FWS/jake FS --dave smallsat conf mid august

Edit - History - Print - Recent Changes - Search
Page last modified on July 03, 2012, at 02:05 PM