3july2012friday 11 haystack all charges to greencube5; check with k when ordering!!!
jake, alex dave flight rob H: patrick checkout list on cupbard*** drop test --successful --independent altair flight in next 2 weeks --1 mile south of MWRA recovery --pre dawn --apogee about 10K feet --max in charge of logistics and permissions --talk to ed stevens**** small ro --on for fall --dave development --mechanical issues wii acc --***side by side w/ wii and duck --response to high spin rates? --accuracy of acc data? --calibration?? patrick status --DNT subboard working. --build up a spare*** --gps board: with no alt limit*** --peter/patrick solar panel connection*** --thermistor?? --new battery packs needed (dated/labelled)*** (update gdocs) --ham radio thermistor?? --thermistor for solar panel surface --data output: 1. solar panel voltage 2. solar panel temp 3. 4. mag/acc 5. 6. 2 photomoeters require ham radio therm for box temp*** current draw comparison????*** peter:: check with robyn re maximum temp*** testing plan*** peter another board --charge controller ongoing todd logistics --ralph available --overlap of launch procedures? --split mrr*** --recovery team procedures --earliest next weekend tom ongiong --next week cedar --hien vo --aug 15 --patrick FWS/peter WS/toddFW/tomFS/dylan FWS/jake FS --dave smallsat conf mid august |