8may2012gc6 (5) chipsat idea
solar panels: --s/p check solar panels --later may: pscpice max: --googledocs lists for fab and anomalies --**wagner closure patrick--realtime,amanda--new data --??how is data packettized and buffered --??at what point do they trip over each other (20) dave: on hold --logic levels, power spikes; ***order intermediate caps --new board layout for DNT support board, using expressPCB --dave needs further testing but design now ok --summer flight foam/fins/gps placement/rtv?/transport --foam-maker problems?? still a problem; possibly thursday class --fin production 2hrs jon/peter/amanda/patrick/tom tues/wed --nina wed/dylan thurs amanda schedule --thesis defense 28 may, 4 wks --fancy launch by 21 may: ompom vs upper white --first full launch 12 may: ledyard to wilder --finish assembly/testing 12-13 --mech ass 7 may wk --mech fab 1 may wk ??is ledyard renting canoes? ??is wilder dam park jon/amanda/patrick stk/peter/max cubesat followups: rome arduino cubesat, smartphone, qb50deployment,af nanosat...patrick, before end of term *** solar panels: uah charging***p/p/s followup dam people? ??? order balloons *** thomas data sensitivity; mag coils? *** jon: plots of flow?? ben: drawings big wheel cart.... |