SpaceclassNotesMain.SpaceclassNotes HistoryHide minor edits - Show changes to output Added lines 2-3:
[[spaceclassNotes/2nov2012]]: dave3/bob progress; plans for winter term Added lines 2-3:
[[spaceclassNotes/26oct2012]]: more dave3 range issues, bob batteries Added lines 2-3:
[[spaceclassNotes/19oct2012]]: range checks prep Changed line 3 from:
[[spaceclassNotes/12oct2012]]: Dave's SmallSat conf presentation [[Presentation1.pdf|here]] to:
[[spaceclassNotes/12oct2012]]: Dave's SmallSat conf presentation [[Attach:Presentation1.pdf|here]] Changed line 3 from:
[[spaceclassNotes/ to:
[[spaceclassNotes/12oct2012]]: Dave's SmallSat conf presentation [[Presentation1.pdf|here]] Changed line 3 from:
[[spaceclassNotes/5oct2012]]: Dave's SmallSat conf presentation [[Presentation1.pdf to:
[[spaceclassNotes/5oct2012]]: Dave's SmallSat conf presentation [[Presentation1.pdf|here]] Added lines 2-4:
[[spaceclassNotes/5oct2012]]: Dave's SmallSat conf presentation [[Presentation1.pdf/here]] Added lines 2-5:
[[spaceclassNotes/18sept2012]]: dave2 flight notes [[spaceclassNotes/14sept2012]]: dave2 prep; drop test prep Changed line 3 from:
[[spaceclassNotes/ to:
[[spaceclassNotes/17aug2012]]: dave2 MRR; drop test prep Added lines 2-3:
[[spaceclassNotes/9aug2012]]: dave2 MRR; drop test prep Added lines 2-3:
[[spaceclassNotes/9aug2012]]: dave2 prep schedule Added lines 2-3:
[[spaceclassNotes/6aug2012]] : new GPS; Dave2 prep and to-do list Added lines 2-3:
[[spaceclassNotes/20july2012]] : debrief and lessons learned and tasks Added lines 2-3:
[[spaceclassNotes/16july2012]] : debrief and lessons learned and tasks Added lines 2-3:
[[spaceclassNotes/13july2012]] : MRR notes for dave flight Added lines 2-3:
[[spaceclassNotes/10may2012]] includes duck float logistics and personnel Changed line 3 from:
[[spaceclassNotes/1may2012]] to:
[[spaceclassNotes/1may2012]] includes schedule for ducks!!! Changed line 3 from:
[[spaceclassNotes/3apr2012]] MRR meeting. This is a list of things to fix/change/update in the MRR document. MRR document when complete should also be uploaded. REVISED 4 apr with notes. to:
[[spaceclassNotes/3apr2012]] MRR meeting. This is a list of things to fix/change/update in the MRR document. MRR document when complete should also be uploaded. REVISED 4 apr with notes. REVISED AGAIN 5 apr with open items starred. Changed line 3 from:
[[spaceclassNotes/3apr2012]] MRR meeting. This is a list of things to fix/change/update in the MRR document. MRR document when complete should also be uploaded. to:
[[spaceclassNotes/3apr2012]] MRR meeting. This is a list of things to fix/change/update in the MRR document. MRR document when complete should also be uploaded. REVISED 4 apr with notes. Changed line 3 from:
[[spaceclassNotes/3apr2012]] to:
[[spaceclassNotes/3apr2012]] MRR meeting. This is a list of things to fix/change/update in the MRR document. MRR document when complete should also be uploaded. Changed line 3 from:
[[spaceclassNotes/ to:
[[spaceclassNotes/29mar2012]] Changed lines 3-7 from:
[[ [[ [[ to:
[[spaceclassNotes/24jan2012]] [[spaceclassNotes/19jan2012]] [[spaceclassNotes/17jan2012]] Changed lines 3-7 from:
[[Main/ [[Main/ [[Main/ to:
[[Main/spaceclassNotes/24jan2012]] [[Main/spaceclassNotes/19jan2012]] [[Main/spaceclassNotes/17jan2012]] Changed lines 3-7 from:
[[Main/ [[Main/ [[Main/ to:
[[Main/SpaceclassNotes/24jan2012]] [[Main/SpaceclassNotes/19jan2012]] [[Main/SpaceclassNotes/17jan2012]] Deleted line 0:
Changed lines 3-7 from:
[[ [[ [[ to:
[[Main/spaceclassNotes/24jan2012]] [[Main/spaceclassNotes/19jan2012]] [[Main/spaceclassNotes/17jan2012]] Added lines 1-5: